Unique ground level unit overlooking the tropical courtyard and swimming pool! This vacation property has wood ceilings in the living areas and tile floors throughout. The four season lanai even has curtains to block out the sun when needed. Amenities include 4 TVs (including the kitchen), 1 DVD player, stereo/CD, free wi-fi, washer/dryer , master en-suite with a walk-in shower and soaking tub and guest bathroom with a walk-in shower. Beds: K/FF. Sleeps 4. 7 night minimum stay. No smoking.
Our properties are clean and safe for arrival! Please visit our guest safety page for details.
Please be advised there will be a painting project as noted below:
BUILDING 1 – August 15, 2022 through August 27, 2022
BUILDING 2 – August 29, 2022 through September 10, 2022
BUILDING 3 – September 12, 2022 through September 24, 2022
BUILDING 4 - September 26, 2022 through October 8, 2022
BUILDING 5 – October 10, 2022 through October 22, 2022
Project duration: 10 weeks (August 15, 2022 – October 22, 2022 ).
2 weeks per building.
Please be advised that this is a tentative schedule and could change on weather or other circumstances outside of our control.
Room | Beds | Baths | Comments |
---|---|---|---|
{[room.name]} |
{[room.beds_details]}
|
{[room.bathroom_details]}
|
{[room.comments]} |
Unique ground level unit overlooking the tropical courtyard and swimming pool! This vacation property has wood ceilings in the living areas and tile floors throughout. The four season lanai even has curtains to block out the sun when needed. Amenities include 4 TVs (including the kitchen), 1 DVD player, stereo/CD, free wi-fi, washer/dryer , master en-suite with a walk-in shower and soaking tub and guest bathroom with a walk-in shower. Beds: K/FF. Sleeps 4. 7 night minimum stay. No smoking.
Our properties are clean and safe for arrival! Please visit our guest safety page for details.
Please be advised there will be a painting project as noted below:
BUILDING 1 – August 15, 2022 through August 27, 2022
BUILDING 2 – August 29, 2022 through September 10, 2022
BUILDING 3 – September 12, 2022 through September 24, 2022
BUILDING 4 - September 26, 2022 through October 8, 2022
BUILDING 5 – October 10, 2022 through October 22, 2022
Project duration: 10 weeks (August 15, 2022 – October 22, 2022 ).
2 weeks per building.
Please be advised that this is a tentative schedule and could change on weather or other circumstances outside of our control.