Phone: 239.992.9100
Location: 26811 South Tamiami Trail | Bonita Springs, FL 34134
Fantastic panoramic views of the Gulf of Mexico and beach can be seen from this top floor, corner unit. After a day at the beach, enjoy a quiet meal on your screened lanai. Unit 104 also offers a remodeled kitchen, plantation shutters, 3 TVs, DVD, washer/dryer and free wi-fi . The master bedroom has a queen bed and an en-suite with walk-in shower. The guest bedroom has 2 twin beds. The guest bathroom has a tub/shower combination.
Our properties are clean and safe for arrival! Please visit our guest safety page for details.
Please be advised there will be a painting project as noted below:
BUILDING 1 – August 15, 2022 through August 27, 2022
BUILDING 2 – August 29, 2022 through September 10, 2022
BUILDING 3 – September 12, 2022 through September 24, 2022
BUILDING 4 - September 26, 2022 through October 8, 2022
BUILDING 5 – October 10, 2022 through October 22, 2022
Project duration: 10 weeks (August 15, 2022 – October 22, 2022 ).
2 weeks per building.
Please be advised that this is a tentative schedule and could change on weather or other circumstances outside of our control.
Room | Beds | Baths | Comments |
---|---|---|---|
{[room.name]} |
{[room.beds_details]}
|
{[room.bathroom_details]}
|
{[room.comments]} |
Fantastic panoramic views of the Gulf of Mexico and beach can be seen from this top floor, corner unit. After a day at the beach, enjoy a quiet meal on your screened lanai. Unit 104 also offers a remodeled kitchen, plantation shutters, 3 TVs, DVD, washer/dryer and free wi-fi . The master bedroom has a queen bed and an en-suite with walk-in shower. The guest bedroom has 2 twin beds. The guest bathroom has a tub/shower combination.
Our properties are clean and safe for arrival! Please visit our guest safety page for details.
Please be advised there will be a painting project as noted below:
BUILDING 1 – August 15, 2022 through August 27, 2022
BUILDING 2 – August 29, 2022 through September 10, 2022
BUILDING 3 – September 12, 2022 through September 24, 2022
BUILDING 4 - September 26, 2022 through October 8, 2022
BUILDING 5 – October 10, 2022 through October 22, 2022
Project duration: 10 weeks (August 15, 2022 – October 22, 2022 ).
2 weeks per building.
Please be advised that this is a tentative schedule and could change on weather or other circumstances outside of our control.
Room | Beds | Baths | Comments |
---|---|---|---|
{[room.name]} |
{[room.beds_details]}
|
{[room.bathroom_details]}
|
{[room.comments]} |